
When handling with a forklift, ensure sufficient load capacity. Fork width must match the machine base; forks must extend beyond the body. Avoid surface damage or base impact.
1) Mechanical Structure Setup

2) Electrical Wiring & Grounding Ensure main power capacity and voltage match equipment requirements.
Cable: ≥4mm² copper (recommended). Overcurrent protection: ~40A. Equipment must be reliably grounded. Connect cables to terminals; check motor rotation.

Note: Wiring must follow the provided electrical schematic. The electrical system should be installed and maintained by qualified electricians.
3)Compressed Air Connection
Ensure dry, sufficient air supply for optimal performance.
Parameters:
Supply Pipe ID: ≥Φ10mm
Air Pressure: 0.5–0.8 MPa
Consumption: 0.02 m³/min
Note: Refer to the pneumatic schematic and the FRL units (mounted on both sides) for component principles and operation.
4) Air Filter & Lubricator
Filter: Separates water/dust. Monitor via transparent bowl and drain manually.
Lubricator: Adjustable oil mist for pneumatic protection.
Regulator: Set pressure to 0.6 MPa. Pull knob to adjust, push to lock.
5) Emergency Stop (E-Stop)
Action: Press red mushroom button for immediate stop. Indicator lights up.
Reset: Manually return swing arm; verify safety before restarting linked devices.
Caution: Emergency use only. Frequent use shortens button lifespan.
6) Motor Protection
Overload: Automatic protection included.
Reset: Clear fault and press the black button on the thermal overload relay.

Hot News2025-04-17
2025-06-06
Copyright © 2025 SHANDONG HICAS MACHINERY (GROUP) CO., LTD.